The project covers the construction of Section I of the future El Carpio – Torredonjimeno motorway, specifically the section constituting the El Carpio Bypass which will run from the A-4 Motorway to the A-306 trunk road.
In addition to the necessary access and exit junctions, a third intermediary junction is planned, for access to El Carpio, as well as a total of 7 bridges, two over the Guadalquivir River, another two over the Arroyo del Asno, one over the railway, and all the necessary elements for joining and exiting the road, together with different structures and frameworks to address the issue of cross drainage.