This project includes the construction of two 30,000 m3 storage tanks for holding treated drinking water and the connections to both the current Purification Plant feeder system and the main distribution network.
The Villa Azul Purification Plant will thus increase its capacity from 52,000 m3 o 112,000 m3, equivalent to a drinking water supply for 320,000 inhabitants at 350l / hour / day.